Back to Switchboard

Waterworks 2001

The intake tube is placed in the pool behind the dam.

The finished dam created a pool at most 20" deep.

A good view of the dam and waterfall. The pipe had to be run along the wall of the gully (left of picture) which is what made the whole operation so difficult.

And the water came out here.

Back to Switchboard